Kitchen Remodeling in Frisco

Home Boss Pros is a Plano-based general contractor for kitchen remodels in Frisco, led by Warren Whitaker with 25+ years of home improvement experience. In a kitchen, most problems start when the plan is vague, so we settle scope, selections, and the order of work before demo starts. Every project starts with a clear written scope and a realistic budget range.

Scope Before Square-Foot Guesses

"Update the kitchen" can mean paint and counters, or a full remodel with new layout, lighting, venting, and flooring. Those are different jobs with different budgets and schedules. We narrow it down early: are soffits coming out, is the island changing size, will the backsplash go to the ceiling, is the refrigerator staying put? Each answer affects labor, materials, and sequencing, and it is what makes two contractor prices comparable.

Cabinets + Layout

Cabinets and layout set up everything else, so we sort them out first. We look at how you cook and move through the room, then coordinate the layout, cabinet sizes, and appliance fit so doors open freely and the fridge and range slide into place without surprises. If you want to move a sink, range, or wall, we explain what that means for plumbing, electrical, and permits before pricing gets serious. We also give practical design guidance and can connect you with design support when needed.

Remodeled kitchen with white cabinets, wood island and light countertops
Kitchen remodel with white cabinets, wood island and pendant lighting

Selections + Allowances

Cabinets, appliances, fixtures, tile, flooring, vent hoods, lighting, and countertop material all affect price, lead times, and trade order. Low allowances can make a number look manageable until real products are picked. We identify which selections need to be made early, such as appliance models before the cabinet layout and electrical rough-in are final, so the budget reflects what you actually want.

Kitchen remodel with white cabinets, wood island and pendant lighting

Countertops + Backsplash

Countertops and backsplash are what people notice first. We coordinate measuring and templating once the cabinets are in, then manage the install so seams land in sensible spots and the sink and cooktop fit cleanly. Outlet and switch locations on the backsplash are planned ahead so nothing looks patched around the edges.

Lighting + Electrical

We plan under-cabinet lights, pendants, outlets, and appliance circuits while the walls are still open, so nothing has to be torn back out later. All electrical work is done to code. New wiring and circuits generally require a permit and inspections; in Frisco that goes through the City of Frisco, and we tell you early and manage the process.

How We Run a Kitchen Remodel

Project Evaluation & Planning

We start with a walkthrough and a short planning phase to set the scope, selections, and a realistic budget range. Larger remodels use Project Evaluation & Planning to define the scope and budget before construction — leading to a written scope and a fixed-price proposal.
 

  • Scope clarity + planning

  • Selections + budget alignment

  • Schedule + trade coordination

Construction

We protect your home, clean up daily, and manage every trade. You get weekly updates, and any change is documented, priced, and approved before we proceed.
 

  • Jobsite protection

  • Trade management + QC

  • Weekly progress updates

Closeout

We finish the punch list, clean up, and walk the finished kitchen with you. Warranty support continues after the job.

​

  • Final clean + walkthrough

  • Warranty support

Kitchen Remodeling in Frisco

We are based in Plano and remodel kitchens in nearby Frisco. Many Frisco homeowners stay in the house during the work, so the plan covers how long the kitchen will be out of service, whether a temporary kitchen setup is needed, and how dust and access are handled. Sequencing is what keeps an occupied-home remodel organized.

Kitchen refresh: $30,000–$45,000

Full kitchen remodel: $45,000–$75,000

Complex kitchen remodel: $75,000+

Major appliances may be homeowner-supplied or included in the project depending on the final scope.

See what a Plano kitchen remodel costs →

FAQ

Do I need a permit for a kitchen remodel in Frisco?

It depends on the work. Cosmetic updates like paint and trim generally do not, but new electrical wiring, plumbing changes, and adding or changing walls generally do. Frisco permits go through the City of Frisco. We confirm what your kitchen needs during planning and manage the process.

Can I open the wall between my kitchen and family room?

Often, but we check first. We look at whether the wall carries a load and what runs through it, such as wiring, ductwork, or plumbing, then put the opening size, beam, and patching in the written scope before anything comes down.

Why do kitchen bids from different contractors differ so much?

Usually because they are not pricing the same job. One may include electrical updates, drywall repair, and appliance install details while another leaves them out or uses low allowances. A clear written scope is what makes prices comparable.

What is the first step to remodel my kitchen in Frisco?

Call or text 469-573-1843, or fill out the form on this page. We start with a walkthrough of your kitchen, then a short planning phase to set the scope, selections, and budget range.